{"id":4094,"date":"2016-08-22T14:18:01","date_gmt":"2016-08-22T14:18:01","guid":{"rendered":"https:\/\/staging.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/"},"modified":"2023-02-07T04:53:00","modified_gmt":"2023-02-07T04:53:00","slug":"semi-forecasts-19-new-fabs-and-lines-to-be-built-this-year-and-next","status":"publish","type":"post","link":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/","title":{"rendered":"SEMI forecasts 19 new fabs and lines to be built this year and next"},"content":{"rendered":"<p>\n\tSEMI, San Jose, Calif., forecasts that 19 new fabs and lines will be built in 2016 and 2017, according to the latest update of the SEMI World Fab Forecast report. While semiconductor fab equipment spending is off to a slow start in 2016, it is expected to gain momentum through the end of the year. For 2016, 1.5% growth over 2015 is expected while 13% growth is forecast for 2017.<\/p>\n<p>\n\tFab equipment spending ? including new, secondary, and in-house ? was down 2% in 2015. However, activity in the 3D NAND, 10nm Logic, and Foundry segments is expected to push equipment spending up to $36 billion in 2016, 1.5% over 2015, and to $40.7 billion in 2017, up 13%. Equipment will be purchased for existing fabs, lines that are being converted to leading-edge technology, as well as equipment going into new fabs and lines that began construction in the prior year.<\/p>\n<p>\n\tThese projects have a probability of 60% or higher, according to SEMI&#8217;s data. While some projects are already underway, others may be subject to delays or pushed into the following year. The&nbsp;SEMI World Fab Forecast report, published May 31, 2016, provides more details about the construction boom.<\/p>\n<p>\n\tBreaking down the 19 projects by wafer size, 12 of the fabs and lines are for 300mm (12-inch), four for 200mm, and three LED fabs (150mm, 100mm, and 50mm). Not including LEDs, the potential installed capacity of all these fabs and lines is estimated at almost 210,000 wafer starts per month (in 300mm equivalents) for fabs beginning construction in 2016 and 330,000 wafer starts per month (in 300mm equivalents) for fabs beginning construction in 2017.<\/p>\n<p>\n\tIn addition to announced and planned new fabs and lines, SEMI&#8217;s World Fab Forecast provides information about existing fabs and lines with associated construction spending, e.g. when a cleanroom is converted to a larger wafer size or a different product type.<\/p>\n<p>\n\tIn addition, the transition to leading-edge technologies (as we can see in planar technologies, but also in 3D technologies) creates a reduction in installed capacity within an existing fab. To compensate for this reduction, more conversions of older fabs may take place, but also additional new fabs and lines may begin construction.<\/p>\n<p>\n\t<a href=\"http:\/\/www.semi.org\/\">www.semi.org<\/a><\/p>\n<p>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SEMI, San Jose, Calif., forecasts that 19 new fabs and lines will be built in 2016 and 2017, according to the latest update of the SEMI World Fab Forecast report.<\/p>\n","protected":false},"author":63082,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[434,450,435,436,1],"tags":[],"class_list":["post-4094","post","type-post","status-publish","format-standard","hentry","category-electronics","category-general","category-news","category-news-articles","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>SEMI forecasts 19 new fabs and lines to be built this year and next - Electronic Device Failure Analysis Society<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SEMI forecasts 19 new fabs and lines to be built this year and next - Electronic Device Failure Analysis Society\" \/>\n<meta property=\"og:description\" content=\"SEMI, San Jose, Calif., forecasts that 19 new fabs and lines will be built in 2016 and 2017, according to the latest update of the SEMI World Fab Forecast report.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/\" \/>\n<meta property=\"og:site_name\" content=\"Electronic Device Failure Analysis Society\" \/>\n<meta property=\"article:published_time\" content=\"2016-08-22T14:18:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-07T04:53:00+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"SEMI forecasts 19 new fabs and lines to be built this year and next\",\"datePublished\":\"2016-08-22T14:18:01+00:00\",\"dateModified\":\"2023-02-07T04:53:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/\"},\"wordCount\":359,\"publisher\":{\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/#organization\"},\"articleSection\":[\"Electronics\",\"general\",\"news\",\"News Articles\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/\",\"url\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/\",\"name\":\"SEMI forecasts 19 new fabs and lines to be built this year and next - Electronic Device Failure Analysis Society\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/#website\"},\"datePublished\":\"2016-08-22T14:18:01+00:00\",\"dateModified\":\"2023-02-07T04:53:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/results\\\/-\\\/journal_content\\\/56\\\/10192\\\/26760248\\\/NEWS\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SEMI forecasts 19 new fabs and lines to be built this year and next\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/#website\",\"url\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/\",\"name\":\"Electronic Device Failure Analysis Society\",\"description\":\"Electronic Device Failure Analysis Society\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/#organization\",\"name\":\"Electronic Device Failure Analysis Society\",\"url\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cdn-prd-main.asm-media.cloud\\\/uploads\\\/sites\\\/41\\\/2022\\\/10\\\/layout_set_logo.png\",\"contentUrl\":\"https:\\\/\\\/cdn-prd-main.asm-media.cloud\\\/uploads\\\/sites\\\/41\\\/2022\\\/10\\\/layout_set_logo.png\",\"width\":360,\"height\":95,\"caption\":\"Electronic Device Failure Analysis Society\"},\"image\":{\"@id\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"\",\"url\":\"https:\\\/\\\/www.asminternational.org\\\/edfas\\\/author\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SEMI forecasts 19 new fabs and lines to be built this year and next - Electronic Device Failure Analysis Society","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/","og_locale":"en_US","og_type":"article","og_title":"SEMI forecasts 19 new fabs and lines to be built this year and next - Electronic Device Failure Analysis Society","og_description":"SEMI, San Jose, Calif., forecasts that 19 new fabs and lines will be built in 2016 and 2017, according to the latest update of the SEMI World Fab Forecast report.","og_url":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/","og_site_name":"Electronic Device Failure Analysis Society","article_published_time":"2016-08-22T14:18:01+00:00","article_modified_time":"2023-02-07T04:53:00+00:00","twitter_card":"summary_large_image","twitter_misc":{"Written by":"","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/#article","isPartOf":{"@id":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/"},"author":{"name":"","@id":""},"headline":"SEMI forecasts 19 new fabs and lines to be built this year and next","datePublished":"2016-08-22T14:18:01+00:00","dateModified":"2023-02-07T04:53:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/"},"wordCount":359,"publisher":{"@id":"https:\/\/www.asminternational.org\/edfas\/#organization"},"articleSection":["Electronics","general","news","News Articles"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/","url":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/","name":"SEMI forecasts 19 new fabs and lines to be built this year and next - Electronic Device Failure Analysis Society","isPartOf":{"@id":"https:\/\/www.asminternational.org\/edfas\/#website"},"datePublished":"2016-08-22T14:18:01+00:00","dateModified":"2023-02-07T04:53:00+00:00","breadcrumb":{"@id":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.asminternational.org\/edfas\/results\/-\/journal_content\/56\/10192\/26760248\/NEWS\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.asminternational.org\/edfas\/"},{"@type":"ListItem","position":2,"name":"SEMI forecasts 19 new fabs and lines to be built this year and next"}]},{"@type":"WebSite","@id":"https:\/\/www.asminternational.org\/edfas\/#website","url":"https:\/\/www.asminternational.org\/edfas\/","name":"Electronic Device Failure Analysis Society","description":"Electronic Device Failure Analysis Society","publisher":{"@id":"https:\/\/www.asminternational.org\/edfas\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.asminternational.org\/edfas\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.asminternational.org\/edfas\/#organization","name":"Electronic Device Failure Analysis Society","url":"https:\/\/www.asminternational.org\/edfas\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.asminternational.org\/edfas\/#\/schema\/logo\/image\/","url":"https:\/\/cdn-prd-main.asm-media.cloud\/uploads\/sites\/41\/2022\/10\/layout_set_logo.png","contentUrl":"https:\/\/cdn-prd-main.asm-media.cloud\/uploads\/sites\/41\/2022\/10\/layout_set_logo.png","width":360,"height":95,"caption":"Electronic Device Failure Analysis Society"},"image":{"@id":"https:\/\/www.asminternational.org\/edfas\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"","url":"https:\/\/www.asminternational.org\/edfas\/author\/"}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/posts\/4094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/users\/63082"}],"replies":[{"embeddable":true,"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/comments?post=4094"}],"version-history":[{"count":0,"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/posts\/4094\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/media?parent=4094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/categories?post=4094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.asminternational.org\/edfas\/wp-json\/wp\/v2\/tags?post=4094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}